The
steel
boilers
EKO-CKS
(nominal
heat
output
150
to
380kW)
are
engineered
to
be
connected
to
open
central
heating
systems,
for
solid
fuel
firing
and
the
heating
of
middle
sized
to
large
premises.
They
can
be
installed
with
direct
connection
to
a
chim
-
ney,
or
with
connection
through
a
cyclone
and
fan(only
EKO-CKS
250,300,350).
They
offer
a
successful
combination
of
modern
design
and
high
tech
and
high
quality
materials,
as
well
as
easy
assembly
and
op
-
eration.
The
extensive
application
of
thoroughly
tested
technical
solutions
and
high
quality
materials,
make
these
boilers
safe
and
reliable.
Steel
boilers
for
central
heating
systems
engineered
for
wood/coal
firing (nominal heat output 150-380 kW).
•
A
carefully
sized
combustion
chamber
with
triple
pass
flue
gas
flow
assures
boiler
operation
at
high
efficiency.
This
makes the boiler very economical to use.
•
The
large
door
and
combustion
chamber
enable
firing
with
big
pieces
of
wood,
as
well
as
easy
cleaning
and
maintenance.
•
The
big
upper
door
enables
easy
and
quick
cleaning
from
the front side of the boiler.
•
The
body
of
the
boiler
is
delivered
separately
from
the
cas
-
ing
with
thermal
insulation
enabling
easier
transportation
and assembly with minimum risk.
•
An
advantage
with
these
boilers
is
the
possibility
of
fitting
the casing after connection to the installation.
•
These
boilers
are
connected
to
open
central
heating
systems.
•
There
is
the
option
to
build
in
a
cyclone
and
flue
gases
ex
-
haust fan(only EKO-CKS 250,300,350).
•
The
boilers
are
manufactured
in
compliance
with
ISO
9001
and ISO 14001.
Technical specifications
Thermometer
Upper door
Opening for draught regulator
Lower door
Primary air door/cleaning
Opening for cleaning the smoke chamber
Water boiler inlet
Boiler outlet
Connections for the open expansion vessel
A
I
9
ADAPTABLE
Designed for combustion with several types of
solid fuels (wood, coal …).
DELIVERY, OBLIGATORY AND OPTIONAL ADDITIONAL
EQUIPMENT:
EFFICIENT
Properly dimensioned chamber and the control
of combustion gases in three passages ensure a
high degree of boiler utilization.
VERSATILE
Large doors and boiler furnaces allow firing with
solid solid fuel and easy cleaning and
maintenance.
INSTALLATION
A separate body of the boiler is supplied, with a
separate thermalinsulation panel, allowing easy
transportation and installation.
Delivery:
•
Boiler body with the boiler door;
•
Outer casing with thermal insula-
tion, a thermometer, draught reg-
ulator, cleaning accessories
(scraper, brush, accessories
holder)
Connection to the heating
system:
•
Safety boiler pump
and heat pump ther-
mostat (0-65 °C);
•
Manual 4-way mixing
valve;
•
Expansion vessel;
Connection to the heating
system with CAS accumula-
tion tank (recommended)
•
Boiler pump;
•
3-way mixing valve
with the motor actua-
tor with controller (as
ESBE CRA or TECH)
•
CAS accumulation
tank (min. 30l/kW)
•
Open expansion
vessel
Contact phone: +371 28818088, +371 29149923
E-mail: info@centrometal.lv
HEATING TECHNIQUE
Solid fuel boilers EKO-CKS
150-380kW
EKO-CKS
150
200
250
300
380
Heat output range
Boiler water content
Boiler mass
Boiler flue gas exhaust diameter*
Boiler flue gas exhaust height H
Chimney draught
Inlet/outlet
Filling/draining
Safety line
Max. operat. temperature
Max. operat. pressure
Total depth of the body A
Total height of the body B
Total width of the body C
Height of the inlet line D
Height of the outlet line E
Height of the safety outlet line F
Height filling/draining G
Dimension I/J
Combustion shamber dimension
Max. log length
kW
l
kg
Ø mm
mm
Pa
R/DN
G
R/DN
°C
bar
mm
mm
mm
mm
mm
mm
mm
mm
mm
mm
110-150
380
812
250
1285
34
2”
1”
6/4”
100
4
1590
1600
815
1600
250
500
155
990x745
450x385
600
150-200
520
1027
300
1300
38
2”
1”
6/4”
100
4
1980
1600
815
1600
250
500
155
1390x745
450x385
1000
200-250
790
1476
300
1705
42
80
1”
40
100
4
2000
2100
920
2100
250
500
155
1390x850
500x590
1000
250-300
963
1757
300
1705
45
80
1”
40
100
4
2350
2100
920
2100
250
500
155
1740x850
500x590
1350
300-380
1155
1986
300
1710
50
80
1”
40
100
4
2350
2100
1065
2100
250
500
155
1740x995
600x585
1350
Contact phone: +371 28818088, +371 29149923
E-mail: info@centrometal.lv
Homepage: www.centrometal.lv
*The internal diameter and height of the chimney must be strictly in
line with the boiler's nominal capacity. It must comply with all
national regulatory documents and manufacturer's
recommendations.