Steel hot water boiler with two combustion chambers is intended for firing wood pellets and logs. In the pellet combustion chamber is installed the burner for wood pellet firing with the automatic pellet firing and automatic grate cleaning function and in the second combustion chamber the wood gasification principle enables burning of logs. Multifunctional digital boiler control using lambda probe and underpressure fan optimizes combustion in both combustion chambers, which increases the efficiency of the boiler. The pellet tank is an integral part of the boiler to which the automatic vacuum pellet supply can be installed. The installation of the accumulation tank (CAS) is obligatory. It is possible to expand the boiler control with the CM2K-B module (steering of 2 heating circuits to the outside temperature, max.4xCM2K), alarm message and boiler start/stop module CMGSM

PRODUCT CHARACTERISTICS:

PELLET TANK

The pellet tank is an integral part of the boiler – option to install the automatic vacuum pellet delivery system.

TWO ENERGIES USED

Intended for firing wood pellets and logs

PELLET IGNITION

The pellet burner is factory-fitted with a burner with automatic burner grid cleaning and pellet ignition.

TWO COMBUSTION CHAMBERS

Two combustion chambers in the common boiler water.
Boiler Class 5. Hot water boiler with two combustion chambers for firing logs and wood pellets, with power output 25, 35 and 45 kW. Compact boiler of high efficiency and low maintenance (with standard built-in automatic cleaning of the grate of pellet combustion chamber it is possible to order additional automatic cleaning of flue gas tubes). Boiler operation is managed with built-in boiler control unit using the lambda probe, boiler sensor, temperature sensor in wood gasification boiler combustion chamber and flue gas temperature sensor by flue gas modulating fan. Modulating boiler operation on pellet side (30 -100%). Modulating boiler operation on wood side (50-100%). Filling level sensor in the pellet tank. Multifunctional digital controller with a colour touch screen conducts the wood gasification burning process in the log firing boiler. It is engineered for installation in open or closed heating systems only through the accumulation tank (CAS), volume min. 50l/kW. The boiler is tested and certified according to EN303-5: 2012 and meets Class 5. It is manufactured in accordance with ISO 9001 and ISO 14001 standard

ADDITIONAL EQUIPMENT:

Obligatory: Connection to CAS accumulation tank: – CAS accumulation tank, 3-way thermostatic valve LTC, VTC…. (60°C); Closed heating system – thermal safety valve, safety-air vent group (2.5 bar) and expansion vessel Open heating system – open expansion vessel;.

BASIC DIMENSIONS:

DELIVERY, OBLIGATORY AND OPTIONAL ADDITIONAL EQUIPMENT:

Tehniskie parametri
25
Nominal heat output - wood
kW
mm
mm
Boiler height C
Width to enter the room D
Boiler depth H
mm
Pellet tank volume
*Flue gas tube connection
mm
mm
l
Ø mm
kW
Nominal heat output – pellets
Boiler width A
Boiler depth B
BioTec Plus 25-45kW
Outlet diameter
Energy efficiency class
R
-
Inlet diameter
R
25
29
31
35
45
25
25
1025
1385
1350
610
765
80
150
6/4”
6/4”
A
+
29
29
1230
1445
1395
720
765
148
160
6/4”
6/4”
A
+
31
31
1230
1445
1395
720
765
148
160
6/4”
6/4”
A
+
35
35
1230
1445
1395
720
765
148
160
6/4”
6/4”
A
+
45
45
1230
1385
1590
720
1265
148
180
6/4”
6/4”
A
+
Combined boilers BioTec Plus 25-45 kW Combined boilers BioTec Plus 25-45 kW
5
4
3
2
Boiler regulation; Fan with electric motor; Flue gas with exhaust; Pellet tank; Boiler water inlet; Boiler water outlet; Side opening for cleaning the flue gas chambe; Place for installation of thermal protection.
6
7
8
Combined boilers BioTec Plus 25-45 kW ADDITIONAL EQUIPMENT:
1
Combined boilers BioTec Plus 25-45 kW Vacuum wood pellet feeding CM2K-B module for steering 2 heating circuits// CSK GSM alarm module for mobile network // CAL Combined boilers BioTec Plus 25-45 kW Obligatory: Connection to Combined boilers BioTec Plus 25-45 kW Delivery
Boiler with casing on 2 wooden pallets, wired, with 4 additional sensors, external temperature sensor, room corrector and cleaning accessories (2 x scraper, brush, cleaning accessories holder).
Delivery:
< CAS accumulation tank, 3- way thermostatic valve LTC, VTC…. (60°C); Closed heating system < thermal safety valve, safetyair vent group (2.5 bar) and expansion vessel; Open heating system < open expansion vessel.
Obligatory: Connection to CAS accumulation tank:
< notification of the boiler status through the mobile network text message or call (errors, warning..) < request for the boiler status phase of work, boiler temperature, through an SMS message in the selected language < boiler start/stop by SMS CAL set alarm (speaker / light) module for error notification by sound or light signal or warning about the boiler operation
GSM alarm module for mobile network // CAL
< allows steering of up to 2 heating circuits to the outside temp. (up to 2 mixing valves and up to 2 heating pumps < possible connection of up to 4 CM2K-B modules (up to 8 heating circuits) < possible connection of up to 2 room correctors to one CM2K module CSK room corrector
CM2K-B module for steering 2 heating circuits// CSK
< Vacuum wood pellet feeding with mole from the storage/room < Vacuum pellet feeding from the large pellet tank (Centropelet box) < Vacuum pellet feeding with the feeder screw (transporter) from the room/storage < Max. 10 m long flex. tubes from the large storage. < Only for pellets DINplus or ENplus A1.
Vacuum wood pellet feeding:
HEATING TECHNIQUE
*The internal diameter and height of the chimney must be strictly in line with the boiler's nominal capacity. It must comply with all national regulatory docu- ments and manufacturer's recommendations.
Contact phone: +371 28818088, +371 29149923 E-mail: info@centrometal.lv Homepage: www.centrometal.lv
BOILER CLASS  DESIGN Combined boilers BioTec Plus 25-45 kW BASIC DIMENSIONS

Combined boilers BioTec Plus (25/29/31/35/45 kW)

Combined boilers BioTec Plus (25/29/31/35/45 kW)
Steel hot water boiler with two combustion chambers is intended for firing wood pellets and logs. In the pellet combustion chamber is installed the burner for wood pellet firing with the automatic pellet firing and automatic grate cleaning function and in the second combustion chamber the wood gasification principle enables burning of logs. Multifunctional digital boiler control using lambda probe and underpressure fan optimizes combustion in both combustion chambers, which increases the efficiency of the boiler. The pellet tank is an integral part of the boiler to which the automatic vacuum pellet supply can be installed. The installation of the accumulation tank (CAS) is obligatory. It is possible to expand the boiler control with the CM2K-B module (steering of 2 heating circuits to the outside temperature, max.4xCM2K), alarm message and boiler start/stop module CMGSM

PRODUCT CHARACTERISTICS:

PELLET TANK

The pellet tank is an integral part of the boiler – option to install the automatic vacuum pellet delivery system.

TWO ENERGIES USED

Intended for firing wood pellets and logs

PELLET IGNITION

The pellet burner is factory-fitted with a burner with automatic burner grid cleaning and pellet ignition.

TWO COMBUSTION CHAMBERS

Two combustion chambers in the common boiler water.
Boiler Class 5. Hot water boiler with two combustion chambers for firing logs and wood pellets, with power output 25, 35 and 45 kW. Compact boiler of high efficiency and low maintenance (with standard built-in automatic cleaning of the grate of pellet combustion chamber it is possible to order additional automatic cleaning of flue gas tubes). Boiler operation is managed with built-in boiler control unit using the lambda probe, boiler sensor, temperature sensor in wood gasification boiler combustion chamber and flue gas temperature sensor by flue gas modulating fan. Modulating boiler operation on pellet side (30 -100%). Modulating boiler operation on wood side (50-100%). Filling level sensor in the pellet tank. Multifunctional digital controller with a colour touch screen conducts the wood gasification burning process in the log firing boiler. It is engineered for installation in open or closed heating systems only through the accumulation tank (CAS), volume min. 50l/kW. The boiler is tested and certified according to EN303-5: 2012 and meets Class 5. It is manufactured in accordance with ISO 9001 and ISO 14001 standard

ADDITIONAL EQUIPMENT:

Obligatory: Connection to CAS accumulation tank: – CAS accumulation tank, 3-way thermostatic valve LTC, VTC…. (60°C); Closed heating system – thermal safety valve, safety-air vent group (2.5 bar) and expansion vessel Open heating system – open expansion vessel;.

BASIC DIMENSIONS:

DELIVERY, OBLIGATORY AND OPTIONAL

ADDITIONAL EQUIPMENT:

Tehniskie parametri
25  Nominal heat output - wood   kW mm mm Boiler height C  Width to enter the room D  Boiler depth H  mm Pellet tank volume *Flue gas tube connection mm mm l Ø mm kW  Nominal heat output – pellets  Boiler width A  Boiler depth B BioTec Plus 25-45kW Outlet diameter Energy efficiency class R - Inlet diameter R 25  29  31  35  45  25 25 1025 1385 1350 610 765 80 150 6/4” 6/4” A + 29 29 1230 1445 1395 720 765 148 160 6/4” 6/4” A + 31 31 1230 1445 1395 720 765 148 160 6/4” 6/4” A + 35 35 1230 1445 1395 720 765 148 160 6/4” 6/4” A + 45 45 1230 1385 1590 720 1265 148 180 6/4” 6/4” A + Combined boilers BioTec Plus 25-45 kW Combined boilers BioTec Plus 25-45 kW
5
4
3
2
Boiler regulation; Fan with electric motor; Flue gas with exhaust; Pellet tank; Boiler water inlet; Boiler water outlet; Side opening for cleaning the flue gas chambe; Place for installation of thermal protection.
6
7
8
Combined boilers BioTec Plus 25-45 kW ADDITIONAL EQUIPMENT:
1
Combined boilers BioTec Plus 25-45 kW Vacuum wood pellet feeding CM2K-B module for steering 2 heating circuits// CSK GSM alarm module for mobile network // CAL Combined boilers BioTec Plus 25-45 kW Obligatory: Connection to Combined boilers BioTec Plus 25-45 kW Delivery
Delivery: Boiler with casing on 2 wooden pallets, wired, with 4 additional sensors, external temperature sensor, room corrector and cleaning accessories (2 x scraper, brush, cleaning accessories holder).
Obligatory: Connection to CAS accumulation tank: < CAS accumulation tank, 3- way thermostatic valve LTC, VTC…. (60°C); Closed heating system < thermal safety valve, safetyair vent group (2.5 bar) and expansion vessel; Open heating system < open expansion vessel.
GSM alarm module for mobile network // CAL < notification of the boiler status through the mobile network text message or call (errors, warning..) < request for the boiler status phase of work, boiler temperature, through an SMS message in the selected language < boiler start/stop by SMS CAL set alarm (speaker / light) module for error notification by sound or light signal or warning about the boiler operation
CM2K-B module for steering 2 heating circuits// CSK < allows steering of up to 2 heating circuits to the outside temp. (up to 2 mixing valves and up to 2 heating pumps < possible connection of up to 4 CM2K-B modules (up to 8 heating circuits) < possible connection of up to 2 room correctors to one CM2K module CSK room corrector
Vacuum wood pellet feeding: < Vacuum wood pellet feeding with mole from the storage/room < Vacuum pellet feeding from the large pellet tank Centropelet box) < Vacuum pellet feeding with the feeder screw (transporter) from the room/storage < Max. 10 m long flex. tubes from the large storage. < Only for pellets DINplus or ENplus A1.
BOILER CLASS  DESIGN Combined boilers BioTec Plus 25-45 kW BASIC DIMENSIONS Combined boilers BioTec Plus (25/29/31/35/45 kW)
Contact phone: +371 28818088, +371 29149923 E-mail: info@centrometal.lv
HEATING TECHNIQUE
Combined boilers BioTec Plus (25/29/31/35/45 kW)
Contact phone: +371 28818088, +371 29149923 E-mail: info@centrometal.lv Homepage: www.centrometal.lv
*The internal diameter and height of the chimney must be strictly in line with the boiler's nominal capacity. It must comply with all national regulatory documents and manufacturer's recommendations.