Nominal heat output
Ø(mm)
R
R
Filling/Draining
lue gases temperature
Max. operating temperature
R
25
Max. operating pressure
Boiler dimensions (A*C*B)
34
°C
°C
bar
mm
150/775
6/4"
6/4"
3/4"
130
90
2,5
1400*1330*585
160/800
6/4"
6/4"
3/4"
130
90
2,5
1370*1370*700
kW
45
180/1270
6/4"
6/4"
3/4"
130
90
2,5
1385*1565*700
*Chimney diameter/height
Boiler water inlet
Boiler water outlet
45
34
25
Boiler regulation;
Boiler water inlet;
Fan with electric motor;
Flue gas exhaust;
Boiler water outlet;
Lever for cleaning flue gas tubes;
Place for mounting the thermal valve;
Side opening for cleaning the smoke chamber.
Max. wood piece length
Wood storage
mm
lit.
450-550
90
450-550
144
450-550
Boiler water content
lit.
115
Boiler mass
kg
519
606
677
130
176
150
Total boiler depth (H)
mm
775
800
1270
BioTec-L 25-45kW
Economical
Pyrolytic combustion makes it possible to use more
than 85%, which saves considerably compared to
classic wood boilers.
PRODUCT CHARACTERISTICS
•
It is delivered pre-wired with the built-in boiler control unit to
control the boiler.
•
The built-in boiler control with the colour touch screen manages
the boiler operation using the lambda probe, temperature
sensor in the boiler combustion chamber, boiler sensor, motor
for the management of primary and secondary air intake and
changing the rpms of underpressure fan on the flue gases
outlet from the boiler.
•
Possible upgrade of the GSM alarm and the module for
steering up to max.8 heating circuits via mixing valves to the
outside or room temperature (additional equipment).
•
In addition to the operation of the boiler, the boiler pump and
the return flow (through the 3-way mixing valve and the return
sensor), the control unit can manage the filling of the
accumulation tank and heating of the domestic hot water tank
(DHW sensor) (sensor + pump).
•
Easy transportation and leveling by 4 adjustable legs of the
boiler.
•
The boiler is tested and certified according to EN 303-5: 2012
and meets Class 5. It is manufactured in accordance with ISO
9001 and ISO 14001 standard.
BASIC DIMENSIONS:
Obligatory additional equipment:
– accumulation tank for heating system (CAS (minimum 30 lit/kw
boiler power)), 3-way thermostat valve, like ESBE LTC 141;
(closed heating system) – thermal safety valve, safety-airvent
group (2,5 bar) and expansion vessel; (open heating system )
– open expansion vessel.
Wood firing boilers BioTec-L
(25/35/45kW)
BioTec-C steel hot water boilers (with nominal heat output of 25 to
45 kW) are designed for wood log fuel firing for the heating of
small and middle sized premises. The wood gasification principle
enables a complete fuel burning. Logs up to 550 mm long can be
inserted into the large combustion chamber. The burning period for
a single fill of logs is at least 4 hours at the rated output and can be
extended to a whole day if the need for heating is less.
The boiler can keep the glow even 8 hours, which means that in
this period it is not necessary to fire up the boiler in order to keep
the heating process. Boiler operation is managed with inbuilt boiler
control unit using the boiler temperature sensor and changing the
rpm’s of underpressure fan on flue gases outlet from boiler. Boiler
is connected to the central heating system through a 3-way
thermostat valve accumulation (buffer) tank (like CAS, CAS B,
CAS S, CAS BS).
The boiler is tested and certified according to the European
standard EN 303-5:2012 and meets class 5. It is manufactured in
compliance with ISO 9001/2008 and ISO 14001/2004 standard
and meet the requirements for ECO design (commission (EU)
2015/1189).
WiFi READY
Digital boiler control supports Internet monitoring and
control of boiler operation via the internet portal.
One charge per day
The duration of a single charge is at least 4 hours full
power with the possibility of prolonging the entire day
if the need for heating is reduced.
Large size wood
Large firebox allows wood to burn up to half a meter
long.
•
Boiler Class 5.
•
Meet the requirements for ECO design (COMMISSION (EU)
2015/1189).
•
Hot water boiler for central heating systems is engineered for
wood log firing of the moisture content under 25% (min 1 year
long air dried wood).
•
The wood gasification principle enables total burning of the fuel,
reducing the cleaning of the boiler to minimum (depends on
wood quality and nominal boiler load).
•
The design and construction, including the wood gasification
principle of complete burning assures high efficiency and makes
the boiler extremely economical.
•
It is environmentally friendly because of extremely low
concentration of harmful components in flue gases.
•
Three doors and the combustion chamber enable loading with
large logs as well as very simple cleaning and maintenance.
•
It is engineered for installation in open or closed central heating
systems only through accumulation tanks (CAS), volume min.
50l/kW and a 3-way thermal valve at 60°C.
DELIVERY, ADDITIONAL EQUIPMENT:
Delivery:
>Boiler with casing,wired, with 4 additional sen-
sors, external temperature sensor, room cor-
rector and cleaning accessories (2 x scraper,
brush, cleaning accessories holder).
Obligatory: Connection to CAS ac-
cumulation tank:
> CAS accumulation tank, 3way ther-
mostatic valve LTC, VTC…. (60°C); or
3-way mixing valve with a motor
actuator
Closed heating system
> thermal safety valve,
safety-air vent group (2.5 bar) and ex-
pansion vessel;
Open heating system
> open expansion vessel
GSM alarm module for mobile net-
work // CAL
> notification of the boiler status
through the mobile network text mes-
sage or call (errors, warning..)
> request for the boiler status phase
of work, boiler temperature, through
an SMS message in the selected
language
CAL set alarm (speaker / light)
> module for error notification
by sound or light signal or warning
about the boiler operation.
CM2K-B module for steering 2
heating circuits// CSK
> allows steering of up to 2 heating
circuits to the outside temp. (up to 2
mixing valves and up to 2 heating
pumps.
> possible connection to 4 CM2K-B
modules (up to 8 heating circuits).
> possible connection to 2 CSK room
correctors per module.
CSK
> room corrector
Connection to the system with
one direct heating circle and
DHW preparation:
> CAS accumulation tank, 3-way
thermostatic valve LTC, VTC….
(60°C);
> 3-way mixing valve with a motor
actuator DHW tank (TB, STEB)
Closed heating system
> thermal safety valve, safety-air
vent group (2.5 bar) and expansion
vessel;
Open heating system
> open expansion vessel
Contact phone: +371 28818088, +371 29149923
E-mail: info@centrometal.lv
HEATING TECHNIQUE
Contact phone: +371 28818088, +371 29149923
E-mail: info@centrometal.lv
Homepage: www.centrometal.lv
*The internal diameter and height of the chimney must be strictly in
line with the boiler's nominal capacity. It must comply with all
national regulatory documents and manufacturer's
recommendations.